China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Fast and superior quotations, informed advisers to help you choose the correct merchandise that suits all your requirements, a short generation time, responsible quality control and different services for paying and shipping affairs for A234 Wpb Fitting, Erw Steel Tube, Oil Nipple, Our final target is "To consider the most effective, To be the Best". Please experience cost-free to call with us if you have any prerequisites.
China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun Detail:

Standard

Grade

Tensile Strength(MPa)

Yield Strength(MPa)

Elongation(%)

Hardness

API SPEC 5CT

J55

≥517

379~552

0.5%

≤241HB

K55

≥655

379~552

0.5%

N80

≥689

552~758

0.5%

L80(13Cr)

≥655

552~655

0.5%

P110

≥862

758~965

0.6%

Chemical Composition of oil well casing:100% bullet tests include ultrasound inspection of full length wall thickness, full length drift diameter, water pressure test, mechanical test (yield, tensile, hardness) etc.
100% final product tests include connection inspection; weld quality inspection and insulation performance tests.

Standard

Grade

Composition(%)

C

Si

Mn

P

S

Cr

Ni

Cu

Mo

V

AIs

API SPEC 5CT
 

J55K55

0.34~0.39

0.20~
0.35

1.25~1.50

≤0.020

≤0.015

≤0.15

≤0.20

≤0.20

 

 

≤0.020

(37Mn5)

N80

0.34~0.38

0.20~
0.35

1.45~1.70

≤0.020

≤0.015

≤0.15

 

 

 

0.11
~0.16

≤0.020

(36 Mn2V)

L80(13Cr)

0.15~0.22

≤1.00

0.25~1.00

≤0.020

≤0.010

12.0~
14.0

≤0.20

≤0.20

 

 

≤0.020

P110

0.26~0.35

0.17~
0.37

0.40~0.70

≤0.020

≤0.010

0.80~
1.10

≤0.20

≤0.20

0.15
~0.25

≤0.08

≤0.020

(30CrMo)

Labels Outside diameter T&C Wall thickness   Type of end-finish
(d/mm) (kg/m) (t/mm)
1 2       J55/K55 M65 L80/R95 N80-1/Q C90/T95 P110 Q125
2004/1/2 9.5 114.3 14.14 5.21 PS PS - - - - -
10.5 114.3 15.63 5.69 PSB PSB - - - - -
11.6 114.3 17.26 6.35 PSLB PLB PLB PLB PLB PLB -
13.5 114.3 20.09 7.37 - PLB PLB PLB PLB PLB -
15.1 114.3 22.47 8.56 - - - - - PLB PLB
5 11.5 127 17.11 5.59 PS PS - - - - -
13 127 19.35 6.43 PSLB PSLB - - - - -
15 127 22.32 7.52 PSLB PLB SLB PLB PLB PLB  
18 127 26.79 9.19 - PLB SLB PLB PLB PLB PLB
21.4 127 31.85 11.1 - PLB PLB PLB PLB PLB PLB
23.2 127 34.53 12.14 - - PLB PLB PLB PLB PLB
24.1 127 35.87 12.7 - - PLB PLB PLB PLB PLB
2005/1/2 14 139.7 20.83 6.2 PS PS - - - - -
15.5 139.7 23.07 6.98 PSLB PSLB - - - - -
17 139.7 25.3 7.72 PSLB PLB PLB PLB PLB PLB -
20 139.7 29.76 9.17 - PLB PLB PLB PLB PLB -
23 139.7 34.23 10.54 - PLB PLB PLB PLB PLB PLB
26.8 139.7 39.88 12.7 - - - - P - -
29.7 139.7 44.2 14.27 - - - - P - -
32.6 139.7 48.52 15.88 - - - - P - -
35.3 139.7 52.53 17.45 - - - - P - -
38 139.7 56.55 19.05 - - - - P - -
40.5 139.7 60.27 20.62 - - - - P - -
43.1 139.7 64.14 22.22 - - - - P - -
2006/5/8 20 168.28 29.76 7.32 PSLB PSLB - - - - -
24 168.28 35.72 8.94 PSLB PLB PLB PLB PLB PLB -
28 168.28 41.67 10.59 - PLB PLB PLB PLB PLB -
32 168.28 47.62 12.06 - - PLB PLB PLB PLB PLB
7 17 177.8 25.3 5.87 - - - - - - -
20 177.8 29.76 6.91 PS PS - - - - -
23 177.8 34.23 8.05 PSLB PLB PLB PLB PLB - -
26 177.8 38.69 9.19 - PLB PLB PLB PLB PLB -
29 177.8 43.16 10.36 - PLB PLB PLB PLB PLB -
32 177.8 47.62 11.51 - PLB PLB PLB PLB PLB -
35 177.8 52.09 12.65 - - PLB PLB PLB PLB PLB
38 177.8 56.55 13.72 - - PLB PLB PLB PLB PLB
42.7 177.8 63.55 15.88 - - - - P - -
46.4 177.8 69.05 17.45 - - - - P - -
50.1 177.8 74.56 19.05 - - - - P - -
53.6 177.8 79.77 20.62 - - - - P - -
57.1 177.8 84.98 22.22 - - - - P - -
2007/5/8 24 193.68 35.72 7.62 - - - -   - -
26.4 193.68 39.29 8.33 PSLB PSLB PLB PLB PLB - -
29.7 193.68 44.2 9.52 - PLB PLB PLB PLB PLB -
33.7 193.68 50.15 10.92 - PLB PLB PLB PLB PLB -
39 193.68 58.04 12.7 - - PLB PLB PLB PLB PLB
42.8 193.68 63.69 14.27 - - PLB PLB PLB PLB PLB
45.3 193.68 67.42 15.11 - - PLB PLB PLB PLB PLB
47.1 193.68 70.09 15.88 - - PLB PLB PLB PLB PLB
51.2 193.68 76.2 17.45 - - - - P - -
55.3 193.68 82.3 19.05 - - - - P - -
2007/3/4 46.1 196.85 68.61 15.11 - - P P P P P
2008/5/8 24 219.08 35.72 6.71 PS PS - - - - -
28 219.08 41.67 7.72   PS - - - - -
32 219.08 47.62 8.94 PSLB PSLB - - - - -
36 219.08 53.58 10.16 PSLB PSLB PLB PLB PLB PLB -
40 219.08 59.53 11.43 - PLB PLB PLB PLB PLB -
44 219.08 65.48 12.7 - - PLB PLB PLB PLB -
49 219.08 72.92 14.15 - - PLB PLB PLB PLB PLB
2009/5/8 32.3 244.48 48.07 7.92 - - - - - - -
36 244.48 53.58 8.94 PSLB PSLB - - - - -
40 244.48 59.53 10.03 PSLB PSLB PLB PLB PLB - -
43.5 244.48 64.74 11.05 - PLB PLB PLB PLB PLB -
47 244.48 69.95 11.99 - PLB PLB PLB PLB PLB PLB
53.5 244.48 79.62 13.84 - - PLB PLB PLB PLB PLB
58.4 244.48 86.91 15.11 - - PLB PLB PLB PLB PLB
59.4 244.48 88.4 15.47 - - - - P - -
64.9 244.48 96.58 17.07 - - - - P - -
70.3 244.48 104.62 18.64 - - - - P - -
75.6 244.48 112.51 20.24 - - - - P - -
2010/3/4 32.75 273.05 48.74 7.09 - - - - - - -
40.5 273.05 60.27 8.89 PSB PSB - - - - -
45.5 273.05 67.71 10.16 PSB PSB - - - - -
51 273.05 75.9 11.43 PSB PSB PSB PSB PSB PSB -
55.5 273.05 82.6 12.57 - PSB PSB PSB PSB PSB -
60.7 273.05 90.33 13.84 - - - - PSB PSB PSB
65.7 273.05 97.77 15.11 - - - - PSB PSB PSB
73.2 273.05 108.94 17.07 - - - - P - -
79.2 273.05 117.87 18.64 - - - - P - -
85.3 273.05 126.94 20.24 - - - - P - -
2011/3/4 42 298.45 62.5 8.46 - - - - - - -
47 298.45 69.95 9.53 PSB PSB - - - - -
54 298.45 80.36 11.05 PSB PSB - - - - -
60 298.45 89.29 12.42 PSB PSB PSB PSB PSB PSB PSB
65 298.45 96.73 13.56 - - P P P P P
71 298.45 105.66 14.78 - - P P P P P
2013/3/8 48 339.72 71.43 8.38 - - - - - - -
54.5 339.72 81.11 9.65 PSB PSB - - - - -
61 339.72 90.78 10.92 PSB PSB - - - - -
68 339.72 101.2 12.19 PSB PSB PSB PSB PSB PSB -
72 339.72 107.15 13.06 - - PSB PSB PSB PSB PSB
16 65 406.4 96.73 9.53 - - - - - - -
75 406.4 111.62 11.13 PSB PSB - - - - -
84 406.4 125.01 12.57 PSB PSB - - - - -
109 406.4 162.21 16.66 P - P P - P P
2018/5/8 87.5 473.08 130.22 11.05 PSB PSB - - - - -
20 94 508 139.89 11.13 PSLB PSLB - - - - -
106.5 508 158.49 12.7 PSLB PSLB - - - - -
133 508 197.93 16.13 PSLB - - - - - -

* P – plain end, S – short round thread, B – buttress, L – long round thread

Name

J55 K55 N80-1 N80-Q L80-1 P110
Casing a bright green band two bright green bands a bright red band a bright red band + a green band a red band + a brown band a bright white band
Coupling entire green coupling + a white band entire green coupling entire red coupling entire red coupling + a green band entire red coupling + a brown band entire white coupling

Casing-Tube
casing-pipe
casing-tubing


Product detail pictures:

China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun detail pictures

China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun detail pictures

China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun detail pictures


Related Product Guide:

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of China Wholesale Erw Steel Tube Suppliers - Oil Well Casing Tube Manufacturer – Zhongshun , The product will supply to all over the world, such as: Philadelphia, Muscat, Swansea, Our market share of our products has greatly increased yearly. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future. We are looking forward to your inquiry and order.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Elsa from Nicaragua - 2017.06.19 13:51
    The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Jonathan from Singapore - 2018.12.28 15:18